Brick Calculator
Enter wall size, openings, brick dimensions, and mortar joint to estimate base brick count, order quantity with waste, packs needed, and approximate mortar volume.
Calculate
Your values convert when you switch units.
Order bricks
The formula
Face area is length × height minus openings. Wall volume is face area × thickness. Brick module volume includes mortar joints on each edge. Base bricks = wall volume ÷ module volume; order adds waste and rounds up; packs round up to whole packs.
Worked example
- Wall 8 m × 2.7 m, thickness 10 cm, no openings → face 21.6 m² and volume 2.16 m³
- Brick 20 × 6.5 × 10 cm, mortar 10 mm → module ≈ 0.21 × 0.075 × 0.11 = 0.0017325 m³
- Base ≈ 2.16 ÷ 0.0017325 ≈ 1,246.8; with 8% waste → ceil(1,346.5) = 1,347 · 3 packs of 500 · leftover 153 · mortar ≈ 0.539 m³
Result: Order 1,347 bricks
How brick quantity is estimated
This calculator uses a volume method so wall thickness, brick dimensions, mortar joints, and openings are all included in one estimate.
Why mortar joints matter
Mortar increases module size, which reduces bricks per cubic metre compared with bare brick dimensions.
Wall thickness drives quantity
For the same wall face, a thicker wall needs proportionally more bricks. Check whether your design is half-brick, one-brick, or cavity wall equivalent.
Openings and waste
Subtract doors and windows as face area. Add more waste for many cuts, corners, decorative bonds, and on-site handling losses.
Interesting facts
Standard brick sizes vary by region
Nominal dimensions differ between countries and manufacturers, so always use the exact product size from supplier datasheets.
Mortar joint thickness affects count
Even small joint changes can shift the total by dozens of bricks on larger walls.
Openings can save significant quantity
Subtracting windows and doors early improves ordering accuracy and reduces overbuy.
Pack quantities are supplier-specific
Many vendors bundle bricks in fixed pack counts, so ordering to full packs simplifies logistics.
Bond pattern influences waste
Complex bonds and corner detailing often require extra cut bricks and higher waste allowance.
Site handling affects breakage
Transport conditions, storage, and on-site movement can increase loss beyond theoretical estimates.
Frequently asked questions
It depends on wall thickness, brick size, and mortar joints. This calculator uses full wall volume for a more reliable estimate.
Yes. Mortar joints are part of the module dimensions and directly affect brick count.
Around 5% can work for simple walls, while 8–12% is common for walls with more cuts, corners, and openings.
Yes. Switch to imperial mode to enter wall dimensions in feet and brick/mortar dimensions in inches.
It estimates approximate mortar volume as wall volume minus solid brick volume. Cement/sand mix ratios should be calculated separately.
Bricks are ordered as whole units, and pack purchasing usually requires full pack rounding.
Enter bricks per pack and the calculator returns the rounded pack count required to cover the order quantity, plus leftover bricks from those packs.
Use it only if block dimensions and joint assumptions match your project; otherwise use a dedicated block calculator.
References
- SI units in construction measurement Volume and length units used when estimating masonry materials.
- Masonry construction practices Industry guidance on bricklaying waste factors and wall estimating.